摘要
大秦铁路大新站通过改造站场及运输设备、优化运输组织结构、修改和完善铁路运输规章制度,成功开行万t重载列车。为适应大秦线全面开行2万t列车的新形势,大新站仍需继续改造既有设施,改进运输组织方式,大幅提高装车组织效率。
After station yard and equipment upgrading and improvement of transport organization and management code, heavy haul train was successfully run in Daxin station. In order to adapt to the new situation of running 20000 ton train on the Daqin line, Daxin station still needs to upgrade the existing facilities and improve transport organization mode to effectively enhance the loading efficiency.
出处
《铁道经济研究》
2009年第5期35-38,共4页
Railway Economics Research
关键词
大秦线
大新站
重载列车
运输
Daqin line
Daxin station
heavy-haul train
transport