摘要
在矿山贯通工程中,采矿设计人员常常根据矿体的地质构造及矿山生产的实际需要,给出巷道掘进的基本思想,测量人员必须根据这一要求进行准确的再设计,以确保贯通的正确实施。本文就某矿9坑斜井与14坑主运平烟贯通点N平面坐标的计算说明这一过程。
In the mine hoing engineering, mining designers usually provide the mainidea to bore the workings according to the geological structure of ore body and practicaldemands of mine production. The surveyers have to exactly design again based on abovedemands to ensure the holing engineering. In this paper, a design process is shownthrough the plane coordinate calculation of the holing point N between number 9 slopeshaft and number 14 horizontal shaft on one mine.
出处
《四川测绘》
1998年第3期103-105,共3页
Surveying and Mapping of Sichuan
关键词
井底车场
平面图
斜井
平峒
贯通点
坐标
计算法
shaft bottom plan
mining engineering plan
slope shaft
horizontal shaft
holing point