雅砻江锦屏二级水电站皮带输送隧洞施工中的地质问题分析及其处理措施 被引量:6

GEOLOGICAL PROBLEMS ENCOUNTERED IN ROCK TUNNEL AT JINPING Ⅱ HYDROELECTRIC POWER STATION AND THEIR TREATMENT MEASURES
下载PDF
导出
摘要 重力坍塌、脆性破坏和楔形掉块是锦屏二级水电站皮带输送隧洞施工中存在的主要地质问题。重力坍塌主要存在于Ⅳ类和Ⅴ类松散破碎岩体中,围岩在重力作用下发生坍塌;脆性破坏主要存在于Ⅰ类和Ⅱ类完整坚硬岩体中,围岩在高地应力作用下发生脆性破裂;楔形掉块主要存在于Ⅱ类、Ⅲ类和Ⅳ类较完整岩体中,围岩在结构面切割组合下形成楔形块体并在重力作用下向临空面发生掉落。根据不同的破坏模式,分别采取了不同的开挖支护措施:重力坍塌段采取了超前锚喷、短进尺、强支护;脆性破坏采取了监测预报、光面爆破、超前钻孔;楔形掉块采取了喷锚支护。 Gravitational collapse, brittle failure and wedge falling are key geological problems that occurred during the construction of a rock tunnel at Jinping Ⅱ hydroelectric power station. The gravitational collapse mainly occurred in the Ⅳ and Ⅴ rock mass. The brittle failure mainly occurred in the Ⅰ and Ⅱ rock mass. The wedges falling mainly occurred in the Ⅱ , Ⅲ and Ⅳ rock mass. Three failure modes are common in the rock tunnel. They would bring about severe danger for workers and construction equipments , and greatly affect the construction schedule. This paper analyzes the geological causes of the threefailure modes and puts forward corresponding excavating and supporting measures. The proposed measures obtained favorable engineering results.
出处 《工程地质学报》 CSCD 北大核心 2009年第5期590-596,共7页 Journal of Engineering Geology
关键词 锦屏二级水电站 皮带输送隧洞 地质问题 处理措施 Jinping Ⅱ hydroelectric power station, Rock tunneling, Rock instability, Rock failure, Treatment measures
  • 相关文献

参考文献14

二级参考文献48

共引文献208

同被引文献33

引证文献6

二级引证文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部