期刊文献+

基于需求的城市快速线形路段入口匝道协调控制研究

Coordination Control Research of on-Ramp for Urban Expressways Linear Section Based on Demands
下载PDF
导出
摘要 针对城市快速线形路段特点,必须对入口匝道进行控制才能解决交通拥堵问题.基于需求的定义,把匝道入口处的车辆分为3个等级.采用基于交通需求的起始-到达模型,让具有城市快速路优先使用权的车辆驶入,达到保证优先级别高的车辆先行,使城市快速路运行在最优状态.计算了一段包括4个出入口的4车道城市快速线形路段在某一天08:30~10:00时间段的入口匝道调节率和相对路段的交通量,同时得到等级较低的车辆需要绕行的数量. At present, there are some urgent traffic problems about urban expressway system which need to be solved in China, such as usual traffic jams. Controlling on-ramp to solve these problems is pointed out according to urban expressway linear section characteristic. Vehicles of on--ramp are divided into three grades based on demand. Introducing O-D model based on traffic demands, vehicles with higher priority are permited into the urban expressway to guarantee vehicles with high grade entering first and to make sure urban expressway being operated optimally. On-ramp regulation rate , traffic on relative section and circuitous vehicle quantities with lower grade are caculated on some day 8:30-10:00 for four-roadway urban expressway linear section including four passageway.
出处 《武汉理工大学学报(交通科学与工程版)》 2009年第5期1000-1003,共4页 Journal of Wuhan University of Technology(Transportation Science & Engineering)
基金 "十一五"国家科技支撑计划重点项目资助(批准号:2006BAJ18B01)
关键词 基于需求 线形路段 匝道控制 优先级 算例 based on demands linear section ramp controlling priority caculation example
  • 相关文献

参考文献5

二级参考文献63

  • 1黄小原,吕振辽.环城高速公路自校正控制[J].自动化学报,1995,21(5):609-612. 被引量:8
  • 2杨晓光 杨佩昆 等.同时考虑进出口匝道车辆排队约束的城市高速道路流入交通准动态控制手法.城市基础设施发展国际学术研讨会论文集[M].杭州:浙江大学出版社,1996.45-462.
  • 3姜紫峰,荆便顺,韩锡令.高速公路入口匝道控制的仿真研究[J].中国公路学报,1997,10(2):83-89. 被引量:31
  • 4佐佐木纲 明神证.都市高速道路网入口匝道流入控制理论[J].交通工学,1968,3(3):8-8.
  • 5J Lindley. A Methodology for Quantifying Urban Freeway Congestion. Transportation Research Record, 1987,1132:1~7
  • 6Technical Advisory Committee. RHODES-ITMS Corridor Control Progress Report,. Arizona Department of Transportation, Phoenix, AZ. 1998, April 16
  • 7杨佩昆,张树升. 交通控制与管理. 人民交通出版社,1995:172-180
  • 8Fei-Yue Wang and Pitu B. Mirchandani. An Integrated Ramp Metering Control System for Freeway/Surface Street Traffic Management", PARCS Report 10-01-99, Systems and Industrial Engineering Department, University of Arizona, Tucson, Arizona, 1999
  • 9J Wright. Twin Cities Integrated Traffic Management System. Proceedings of 1993 annual meeting of IVHS America, Session 18. 1993
  • 10L Lipp, L Corcoran, G Hickman. Benefits of Central Computer Control for Denver Ramp-Metering System", Transportation Research Record, 1991,1320: 3~6

共引文献88

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部