摘要
沈阳地铁1号线南京街站-南市站区间盾构工程为避免干扰交通,盾构机采用封闭式车站调头始发的施工方式,在施工中通过软件模拟,事先确定最佳施工路线,控制各项工艺流程和操作要点,规避了施工风险。
Close station U-turn launching construction method is adopted in shield project of the segment from Nanjingjie station to Nanshi station of Shenyang Subway Line 1, and construction risks are effectively avoided through adopting software simulation, determining the best construction route in advance and controlling process flow and key operation points.