摘要 在600MW超临界机组启、停过程中,通常使用电动给水泵向锅炉供水,待机组负荷达到30%BMCR后才启动汽动给水泵并入系统向锅炉供水。通过不断努力和摸索,某厂成功实现了600MW超临界机组在启、停全过程使用汽动给水泵向锅炉供水,而电动给水泵此时处于停运备用状态。这种上水方式的优化运行,有效地节省了大量电能,提高了机组运行的经济性。 The electric pump is usually used to feed water for boiler during the start-up and shut-down processes of 600 MW supercritical units,the turbo-feed pump starts to work until the unit load reaches 30% BMCR.Through continuous exploration,one power plant has used successfully the turbo-feed pumps to feed water for boiler of 600 MW supercritical unit during the whole process of start-up and shut-down,and the electric feed pump was only as backup,this optimal way of feeding water is effective on saving electricity and increases the economical efficiency of unit operation.
作者 谌莉
出处 《华电技术》 CAS 2009年第10期19-21,共3页 HUADIAN TECHNOLOGY
关键词 机组启 停过程 汽动给水泵 上水方式 600 MW超临界机组 process of unit start-up and shut-down turbo-feed pump feed water mode economical efficiency 600 MW supercritical unit
  • 相关文献

参考文献1

  • 1岑可法,周吴,池作和.大型电站锅炉安全及优化运行技术[M].北京:中国电力出版社,2007.

共引文献9

同被引文献19

引证文献6

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部