火力发电厂600MW机组干除灰系统设计方案优化 被引量:2

Optimization of dry ash removal system design scheme for a 600 MW unit in thermal power plant
下载PDF
导出
摘要 在锅炉排灰量中,一电场、二电场灰分占了总数的96%左右,因此一电场、二电场的输灰效果在整个系统方案的合理配置非常重要。对宁夏水洞沟电厂的600MW机组干除灰系统的配置方案进行了优化调整,系统优化以后,安全稳定性及经济性明显提高。 The ash emissions of first and second electric fields of precipitator are about 96% of the total ash emission of boiler.Therefore,the ash conveying effects of first and second electric fields are very important for rational configuration scheme of whole system.The configuration scheme of dry ash removal system of 600 MW unit in Ningxia Shuidonggou Power Plant had been optimum regulated,and the safety,stability and economical efficiency of the unit were raised obviously due to the optimization.
作者 包平浪
出处 《华电技术》 CAS 2009年第10期24-26,58,共4页 HUADIAN TECHNOLOGY
关键词 600MW机组 干除灰 内旁通管 系统方案 优化 600 MW unit dry ash removal internal bypass pipe system scheme optimization
  • 相关文献

参考文献2

共引文献2

同被引文献5

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部