摘要 分析液压系统橡胶密封件失效的原因,采用模糊综合评价法对密封件的失效可能性和失效后果做出等级评定,根据风险矩阵评价密封件的风险等级大小,对风险等级不同的密封件进行分类处理.以液压系统中一橡胶O形圈为例对上述评价方法进行具体介绍,结果表明该密封件处于低风险区,可延长其使用寿命,为提高橡胶密封件的使用寿命提供科学依据. The origin of rubber sealing failure in the hydraulic system was analyzed and the failure possibility and consequence were assessed in their level with fuzzy comprehensive assessment method. Based on the risk matrix, the risk level of the sealing was assessed and risk gradation of sealing with different risk level was conducted. By taking a rubbery Oring of hydraulic system, as example of above-mentioned assessment method, the assessment process was introduced in the concrete. The result showed that this rubber sealing was at low-risk range and its service life could be elongated, providing a scientific basis to verify that the operational life span of rubber sealing was guaranteed.
出处 《兰州理工大学学报》 CAS 北大核心 2009年第5期70-73,共4页 Journal of Lanzhou University of Technology
基金 甘肃省自然科学基金(0809RJZA008)
关键词 密封 液压系统 模糊综合评价 风险评价 sealing hydraulic system fuzzy comprehensive assessment risk assessment
  • 相关文献

参考文献11

二级参考文献26

  • 1宋学义.袖珍液压气动手册[M].北京:机械工业出版社,1998..
  • 2复廷栋.液压传动的密封与密封装置[M].重庆:中国农业出版社,1982,4..
  • 3黎启柏.液压元件手册[M].北京:冶金工业出版社,1999..
  • 4SA/FoU-Report91/01.带裂纹构件安全评定规程-手册:瑞典标准.[S].华东理工大学化机所,李培宁译,1991..
  • 5Schwalbe K-H, Zerbst U, et al,EFAMETM97:The ETM method for assessing crack - like defects in engineering structures GKSS Report GKSS 98/E/6 1988 and EFAM ETM - M. M,96:The ETM method for assessing the significance of crack - like defects in joints with mechanical hterogeneity ( strength mismatch).GKSS 97/E/9 1997
  • 6Section A5000, flaw evaluation procedure, of RSE - M code, Rules for Inspection of Nuclear Power Plant Components, 1977, AFCEN
  • 7Anderson P. Bergman M. et al , Aprocedure for safety assessment of components with crack- handbook, Swdenf: SAQ Kontroll AB. 1996SAQ FoU-Report 96/08
  • 8SINTAP. Structure Integrity Assessment I'rocedure for European Industry Project BE 95 -1426. Final Procedure, British Steel Report,Rotherham, 1999
  • 9Ainsworth RA. et al. R6-Revision 4:2001,Assessment of the integrity of structure containing defect British Energy Generation Ltd. Amendment, 200
  • 10BS7910: 1999 (incorporating Amendment No. 1)Guide on methods for assessing the acceptability of flaws in metallic structures, British Standards Institution, London, 2000API. 579, Recommended practice for fitness - for - service Washington, D. C. American Petroleum Institute,2000

共引文献58