摘要 乌江构皮滩水电站电站厂房为岩溶地区修建的特大型地下厂房,围岩稳定问题较突出,影响围岩稳定的因素主要有岩溶与不利结构面及其组合的块体等。从前期选址、布置到后期施工处理过程中,进行了大量工程地质研究,并提出了合理的布置及处理方案。目前地下厂房已开挖完成,进入机组安装阶段,在整个施工过程中没有出现岩溶涌水、涌泥以及规模较大的块体失稳现象,围岩的变形经过施工处理已基本收敛,从监测情况来看,围岩处理效果良好。 The underground powerhouse of Goupitan Hydropower Station in Wu River is an oversize powerhouse built in the karst area. The stability problem of wall rock was prominent, and the factors that affect the wall rock stability including karst, disadvantage structure surface, and the block body combined by the two factors. During the process of prophase site choosing, collocation, and construction treatment, a great deal of study on project geology was implemented, and rea- sonable disposal and treatment scheme were brought forward. At present, the underground powerhouse digging was fin- ished and has enter the phase of set installment. During the whole construction process, the events of water and mud sur- ging, and block body losing stability did not occurred;the distortion of wall rock has been converted after construction treatment, and the effect of wall rock treatment seems good from the monitoring.
出处 《资源环境与工程》 2009年第5期754-757,共4页 Resources Environment & Engineering
关键词 构皮滩水电站 地下厂房 岩溶系统 围岩稳定 Goupitan Hydropower Station underground powerhouse karst system wall rock stability
  • 相关文献

同被引文献10

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部