惠州抽水蓄能电站A厂下平洞断层处理分析

Analysis on Fault Treatment of Lower Adit in Plant A of Huizhou Pumped Storage Power Station
下载PDF
导出
摘要 阐述了惠州抽水蓄能电站A厂下平洞的主要地质构造及厂区控制性断层,分析了地质构造的水力联系及下平洞的主要地质构造的处理措施,探讨了高压隧洞采用钢筋混凝土衬砌可以通过灌浆来处理地质构造和围岩薄弱部位。 The author described the principal geological structure of lower adit and controlled fault in power house area of plant A of Huizhou Pumped Storage Power Station,analyzed the hydraulic relationship of geological structure and treatment measure of lower adit s principal geological structure,and expounded that the geological structure and weak part of the wall rock could be treated by grouting for high-pressure tunnel lining with the reinforced concrete.
作者 黄森胜
出处 《资源环境与工程》 2009年第5期758-761,共4页 Resources Environment & Engineering
关键词 高压隧洞 断层 灌浆 high-pressure tunnel fault grouting
  • 相关文献

参考文献3

  • 1陆兆涛.工程地质学[M].北京:水利水电出版社,1989:15-25.
  • 2李志坚.岩土工程勘察[M].南京:河海大学出版社,1999:8-13.
  • 3廖建强,吴国荣,吴秋苏,等.广东惠州抽水蓄能电站工程A厂输水系统和地下厂房系统设计报告[R].广州:广东省水利电力勘测设计研究院,2008:14-40.

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部