阐述了惠州抽水蓄能电站A厂下平洞的主要地质构造及厂区控制性断层,分析了地质构造的水力联系及下平洞的主要地质构造的处理措施,探讨了高压隧洞采用钢筋混凝土衬砌可以通过灌浆来处理地质构造和围岩薄弱部位。
The author described the principal geological structure of lower adit and controlled fault in power house area of plant A of Huizhou Pumped Storage Power Station,analyzed the hydraulic relationship of geological structure and treatment measure of lower adit s principal geological structure,and expounded that the geological structure and weak part of the wall rock could be treated by grouting for high-pressure tunnel lining with the reinforced concrete.