摘要
本文基于Parker等人泥沙输移矢量式的分析和研究,增加了上举力的作用,并考虑了泥沙颗粒受力非平衡条件,采用牛顿力学的矢量分析法,推导了泥沙输移的通用矢量式.经对公式简化,且用Ikeda和笔者试验资料的验证,证明计算值与试验值吻合较好.
Based on the analysis and research of Parker vectorial bedload formula, a kind of general vectorial bedload transport formula is deduced by adding lift force and taking non equilibrium forces acting on sediment particle into account. The calculated result of the simplified formula is compared with the experimental data as well as from Ikeda and the authors. It is shown that the calculated results agree well with the observed data.
出处
《水利学报》
EI
CSCD
北大核心
1998年第9期37-40,共4页
Journal of Hydraulic Engineering
基金
国家自然科学基金
水利部资助项目
关键词
泥沙输移
矢量方程
河宽调整
sediment transport, vectorial equations, width adjustment of river.