摘要
结合实际工程的设备基础施工,针对基础地下室外墙厚且转折点多、柱截面较大的特点,合理安排施工顺序,采取恰当的模板形式和加固方法,准确安装预埋件及注重特殊部位的处理,以保证混凝土外观质量达到清水混凝土标准。
According the construction practice of the equipment foundation, aiming at the features that the outer wall is thick and has many turning points with a big column section, arranging the construction process rationally, adopting the suitable form style and strengthen method, installing the pre-buried accessories and paying attention to special part, can make sure the outlook quality of the concrete reach the fair-faced concrete standard.
出处
《工程质量》
2009年第10期59-61,共3页
Construction Quality
关键词
设备
基础
模板
施工
equipment
foundation
form
construction