1N. Viswanadham, S. Gaonkar Roshan. Partner Selection and Synchronized Planning in Dynamic Manufacturing Networks [J]. IEEE Transactions on Robotics and Automation ,2003,19 ( 1 ) : 117 - 130.
2Zhan S,Poulin D. Partnership Management within the Virtual Enterprise in a Network[ M]. IEMC,1996. 645-650.
3Talluri. S, Baker. R. C. A Quantitative Framework for Designing Efficient Business Process Alliance [ A]. International Conference on Engineering Management and Control[ C ]. 1996. 656 - 661.
4Macro Fishers, Hendrik John, Tobias Teich. Optimizing the Selection of Partners in Production Network [ J]. Robotics and Computer-integrated Manufacturing, 2004,20(6) :593 -601.
5Wang DW, Yung KL A Heuristic Genetic Algorithem for Subcontractor Selection in a Global Manufacturing Enviroment[ J ]. IEEE Transactions on Systems, Man, and Cybermetics-Part C: Applications and Reviews, 2001, (31) :198 - 198.
6Wu NQ, Mao N. An Approach to Partner Selection in Agile Manufacturing [ J ]. Journal of Intelligent Manufacturing, 1999,10(6) :519-529.