介绍了张家港大桥施工用挂篮的结构形式和主要特点,进行了结构计算,指出本次挂篮设计在理论上满足了结构受力要求,实际施工效果也很好,并且降低了施工造价,节约了施工成本。
The paper introduces the structural forms and main characteristics of hanging basket in Zhangjiagang Bridge,undertakes the structural calculation,points out the hanging basket design to meet the structural stressed requirement,and its construction effect is better,so as to lower the construction costs,and to save the construction costs.
出处
《山西建筑》
2009年第33期336-337,共2页
Shanxi Architecture
关键词
桥梁
挂篮
设计
施工
bridge
hanging basket
design
construction