以某隧洞施工为例,对TBM施工掘进速度作了论述,并对通过检修洞之后的施工月进尺估算进行了探讨,同时根据TBM施工经验提出提高施工进尺的一些措施,以确保隧洞施工顺利进行。
Taking some tunnel construction as an example,the paper illustrates the excavation speed in TBM construction,explores the estimation of the advance in construction month after being checked,and points out some measures according to some TBM construction experience,so as to ensure the smooth operation for the construction.