摘要
简要介绍了大亚湾核电站换料设计的基本原理和内容,以及两个机组第四循环换料设计的主要结果,并与测量值作了比较。计算结果表明,两个机组的换料设计都满足了安全性准则和经济性要求;测量结果表明,理论预测值与实测值符合良好。
The basic principles and the contents of the reload design for Daya Bay nuclear power station are briefly introduced.The incore reload design results,and the comparison between the calculated values and the measured values of both units the fourth cycle are also given.The reload design results of the two units satisfy all the economic requirements and safety criteria.The experimented results shown that the predicated values are tally good with all the measurement values.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
1998年第5期385-389,共5页
Nuclear Power Engineering
关键词
核电站
换料设计
堆芯
燃料管理
Daya Bay nuclear power station Incore reload design Incore fuel management