摘要
本文结合国内已投运和在建的1000MW超超临界发电机组以及同类型项目的设计投标方案,对主厂房布置格局进行了梳理和探讨,以期为国内后续的1000MW超超临界机组建设提供参考和借鉴。
Specific to the 1000MW ultra super critical power generation units that are in operation or under construction, as well as the design bidding solutions for similar projects, the layout of main building is collated and discussed in this paper. It is hoped that the discussion will provide reference for construction of future 1000MW ultra super critical units.
出处
《电力勘测设计》
2009年第5期36-39,44,共5页
Electric Power Survey & Design