摘要
白山续建工程厂房开挖施工是在已建的一期工程投入运行的基础上进行的,边界条件复杂,具有许多独到之处。本文介绍了续建工程厂房开挖的施工技术,可供同类工程借鉴。
The excavating construction for expansion of factory building of Baishan project is carried out after the first phase of construction The detailed situation about excavating technology of the factory building for extend project,similar project can be used for reference
出处
《工程爆破》
1998年第3期26-30,共5页
Engineering Blasting