6Marsel Friedl.The construction of large-span concrete arch bridges with cantilevering method using temporary cablestays[Z].Proceedings of the International Conference on bridge,Croatia,2006.
7戴震番.克尔克桥的大跨度混凝土拱桥悬臂法施工.世界桥梁,1982,(4).
8F T K Au,J J Wang,G D Liu.Construction control of reinforced concrete arch bridges[J].Journal of Bridge Engineering,2003,(1).
10Bazant Z P,Baweija S.Justification and Refinement of Model B3 for Concrete Creep and Shrinkage-1.Statistics and Sensitivity[J].Material & Structure.1995,181:415-430.