±660kV同塔双回直流线路与其送/受端交流系统的相互影响 被引量:8

Research on Interaction of ±660 kV Power Transmission Project Adopting Layout of Double-Circuit on the Same Tower With AC Power Systems at Its Sending and Receiving Ends
下载PDF
导出
摘要 分析了宁东—山东直流工程交流系统故障对直流系统的影响和直流系统故障对送、受端交流系统的影响,重点研究了同塔双回线路发生故障后,送端系统的频率控制问题及受端电网的安全稳定性,并有针对性地提出加强交、直流系统间协调控制的措施,以提高系统整体安全稳定运行水平。 The ±660 kV DC power transmission project from East Ningxia to Shandong, to which the layout of double-circuit on same tower is adopted, is the first HVDC demonstration project of this voltage grade in China. In the viewpoint of the impacts of faults in ±660kV power transmission project on AC power systems at its sending and receiving ends and that of faults in these AC systems on ±660kV transmission project itself, the system scheme for this project is checked and analyzed, especially, the frequency control of the AC power system at its sending end and both security and stability of AC power system at the receiving end are emphatically researched while faults in ±660kV power transmission project occur. To improve overall security and operation level of the AC/DC system, some measures to enhance the coordinative control between HVDC project and AC systems are put forward.
出处 《电网技术》 EI CSCD 北大核心 2009年第19期83-86,共4页 Power System Technology
关键词 同塔双回 频率控制 协调控制 double-circuit on the same tower frequency control coordinative control
  • 相关文献

参考文献10

二级参考文献107

共引文献518

同被引文献108

引证文献8

二级引证文献193

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部