期刊文献+

黄壁庄水库副坝防渗墙监测资料分析

Analysis on monitoring data of cut-off wall of auxiliary dam at Huangbizhuang reservoir
下载PDF
导出
摘要 副坝工程存在许多问题,垂直混凝土防渗墙的实施彻底解决了这些隐患。对防渗墙观测资料的分析计算说明,防渗墙埋设的观测仪器工作正常,防渗墙的应力应变正常,且具备一定的规律。正常蓄水情况下,防渗墙的运行是安全的。 There were many defects with auxiliary dam construction, and vertical cut-off wall solved them. By analyzing the monitoring data, the conclusion was gotten that the monitoring instruments and measured stress-strain of the cut-off wall were normal, as well, with normal impoundment, the cut-off wall was safe.
作者 齐建堂
出处 《大坝与安全》 2009年第5期25-28,共4页 Dam & Safety
关键词 副坝 防渗墙 观测仪器 应力应变 土压力 auxiliary dam cut-off wall monitoring instrument stress-strain earth pressure
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部