摘要 糯租水电站工程建设已完工,本文根据坝基开挖后所揭露的地质状况,对坝址工程地质条件进行综述,并对坝基建基面、地震液化、岩(土)体承载力、渗透稳定及防渗处理等主要工程地质问题分析评价和复核调整优化处理。 The project construction for Nuozu Hydropower Station has been completed. The paper summarizes the engineering geological conditions of the base site based on geological status revealed after excavation of the dam foundation, and analyzes and evaluates, reviews, adjusts and optimizes the dam foundation construction surface, earthquake liquefaction, rock (soil) mass beating force, seepage stability and seepage prevention treatment, and other main engineering geological problems.
作者 陈寿松
出处 《云南水电技术》 2008年第4期22-25,28,共5页
关键词 糯租水电站 工程地质 坝基渗漏 渗透稳定 Nuozu Hydropower Station Engineering Geological Dam Foundation Seepage Seepage Satiability