期刊文献+

高含沙水泵站前池淤积形态及减淤研究 被引量:2

Research on Silted Shape and Silt Reduction in the Pumping Station Forebay with Water Heavily Silt Mixture
下载PDF
导出
摘要 30年来,宁夏依托黄河建设了诸多高扬程多梯级扬水工程,在干旱带发展了13.33万hm2的生态绿洲,为100多万人生产生活和脱贫致富提供了保障。然而黄河水高含沙量也给扬水工程正常运行带来诸如,前池泥沙淤积、水泵磨损、泵站装置效率下降、供水成本增加等突出的问题。通过对宁夏最有代表的红寺堡和固海扩溉扬水工程泵站前池泥沙淤积状况的量测,分析了实际工程中前池形式与泥沙淤积形态和规律,提出了多泥沙河流条件下,前池形式应优选紧缩性侧向进水或圆形进水。 Many pumping projects with high-lift and staves have been constructed for 30 years in the part of Yellow River in Ningxia. The ecological oasis of more than 13.33 ten thousand hectares has been developed in the arid zone, more than 1 million people have got security in agricultural production , life, casting off poverty and making for prosperity, However, the Yellow River with heavily silt also gives the pumping projects unusual operation, such as sedimentation accumulation in the forehay, the pump wear, the pum- ping station unit efficiency to drop, the water supply cost to increase and so on prominent question. This paper analyzes the actual forebay form and the sedimentation shape and the rule, through expands to the gauging for the most representative forebay sedimentation accumulation condition of Hongsibao and Guhai pumping stations in Ningxia, the forebay form should be the optimal compactness lateral enter or the circular enter under the multi-silt conditions of rivers.
作者 薛塞光 刘佳
出处 《中国农村水利水电》 北大核心 2009年第11期110-113,共4页 China Rural Water and Hydropower
关键词 含沙水 前池形式 前池淤积 water silt mixture forebav form silt reduction
  • 相关文献

同被引文献22

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部