摘要
介绍了冬瓜山辅助井提升机电控设备配置的特点和安装、调试的经验,阐述了设备引进的必要性和取得的应用效果,同时对提升电控设备的引进提出建议。
This article presents the configuration characterstics of eletric control equipment for Dongguashan auxiliary shaft hoist and experiences of installation and commissioning, expounds the necessity of equipment import and acquired application results, at the same time, offered suggestion for import of hoist electric control equipment.
出处
《有色矿山》
1998年第5期36-38,共3页
Nonferrous Mines
关键词
提升系统
电控设备
配置
铜矿
矿井提升
Hoisting systems Electric control equipment Configuration