期刊文献+

采用量子粒子群算法的一类模糊作业车间调度问题的研究 被引量:2

Quantum particle swarm optimization for one of the fuzzy job shop scheduling problems
下载PDF
导出
摘要 针对一类具有模糊加工时间和模糊交货期的作业车间调度问题,提出一种收敛速度快、全局性能好、不易陷入局部最优的智能迭代算法——量子粒子群算法,对其进行求解。通过仿真实例对此算法进行验证,结果表明,在求解带模糊加工时间和模糊交货期的作业车间调度问题时,量子粒子群算法有很好的效果。 Studies on one of the job shop scheduling problems with fuzzy processing time and fuzzy due date, and proposes Quantum Particle Swarm Optimization(QPSO) to solve this problem,which has good convergence speed and performance in searching global optimum. Use a practical analyses to confirm the performance of the method. The experimental results of QPSO on this problem show the efficiency of the new algorithm.
出处 《现代制造工程》 CSCD 北大核心 2009年第11期25-28,共4页 Modern Manufacturing Engineering
基金 上海市重点学科建设资助项目(S30504)
关键词 模糊作业车间调度问题 模糊加工时间 模糊交货期 量子粒子群算法 优化 Fuzzy Job Shop Scheduling Problem (FJSSP) fuzzy processing time fuzzy due date Quantum Particle Swarm Optimization ( QPSO ) optimization
  • 相关文献

参考文献5

二级参考文献44

  • 1玄光男 程润伟.遗传算法与工程优化[M].北京:清华大学出版社,2004..
  • 2Cheng R W,Gen M, Tsujimura Y. A tutorial survey of job-shop scheduling problems using genetic algorithms.I. Representation[J]. Computers & Industrial Engineering,1996,30(4):983-997.
  • 3Ishii H,Tada M,Masuda T. Two scheduling problems with fuzzy duedates[J]. Fuzzy Sets and Systems,1992,46(3):339-347.
  • 4Han S,Ishii H,Fujii S. One machine scheduling problem with fuzzy due dates[J]. European Journal of Operational Research,1994,49(1):1-12.
  • 5Ishibuchi H,Yamamoto N,Murata T,et al. Genetic algorithms and neighborhood search algorithm for fuzzy flowshop scheduling problem[J]. Fuzzy Sets and Systems,1994,67(1):81-100.
  • 6Ishibuchi H,Murata T,Lee K H. Formulation of fuzzy flowshop scheduling problems with fuzzy processing time[A]. Proceedings of the 5th IEEE International Conference on Fuzzy Systems[C]. New York, NY, USA:IEEE, 1996.199~205.
  • 7Tsujimura Y,Gen M,Kubota E. Solving job-shop scheduling problems with fuzzy processing time using genetic algorithms[J]. Journal of Japan Society for Fuzzy Theory and Systems,1995,7(2):1073-1083.
  • 8Murata T,Gen M,Ishibuchi H. Multi-objective scheduling with fuzzy due-date[J]. Computers & Industrial Engineerig,1998,35(3):439-442.
  • 9Adamopoulos G I,Pappis C P. A neighbourhood-based hybrid method for scheduling with fuzzy due-dates[J]. International Transactions in Operational Research,1998,5(3):147-153.
  • 10Lam S S,Cai S. Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates[J]. Nonlinear Analysis:Real World Applications,2002,3(2):307-316.

共引文献23

同被引文献11

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部