期刊文献+

桂平二线船闸输水系统与闸室墙结构方案研究 被引量:2

Study on filling and emptying system of Guiping second-line shiplock chamber wall structure
下载PDF
导出
摘要 桂平航运枢纽二线船闸设计水头为10.5m,输水系统类型为侧墙长廊道短支孔分散输水系统。船闸区上覆地层为第四系冲积的粘土,闸首闸室基础均置于石灰岩地基上,岩石完整性相对较好,因此具备采用衡重式或混合衬砌式闸室墙结构的条件。经充分比较,采用闸底长廊道输水系统、混合衬砌式闸室墙结构的方案,船闸充、泄水时间均可控制在10min以内,闸室内泊稳条件良好,达到了优化方案节省开挖量和混凝土工程量的目的。 The design head of the second-line shiplock in the Gulping Junction is 10.5 m.The structure of long culvert short hole weight retaining wall was chosen in this junction.The overlying strata of lock area is quaternary alluvial clay, the foundation basis were placed on limestone bedrock, the integrity of the rock is relatively good, with the conditions to build gravity or mixed-type lining chamber wall.After full comparison, using the lock bottom long culvert filling and emptying system and the structure form of mixed-type lining chamber wall,both lock filling and emptying time can be controlled within 10 rain, the mooring condition is good inside the lock chamber, and the purpose to save volume of the excavation and the concrete project is achieved.
作者 陆宏健
出处 《水道港口》 2009年第5期365-368,共4页 Journal of Waterway and Harbor
关键词 船闸工程 输水系统 闸墙结构 设计 lock filling and emptying system chamber wall structure design
  • 相关文献

参考文献4

二级参考文献6

  • 1宣国祥,水利水运科学研究,1994年,1/2期
  • 2宗慕伟,1989年
  • 3团体著者,1987年
  • 4JTJ306—2001.船闸输水系统设计规范[S].
  • 5宗慕伟.阀门变速开启的船闸水力计算[J].水利水运科学研究,1988,(1):55-61.
  • 6宗慕伟,等.芒稻船闸扩容改造工程输水系统模型试验研究报告[R],南京:南京水利科学研究院,2006

共引文献114

同被引文献21

  • 1朱岳明,徐之青,曹为民,贺金仁,吴健,闪黎,马东亮.墩墙混凝土结构水管冷却分析[J].工程力学,2004,21(5):183-187. 被引量:22
  • 2麦建清.乐滩水电站船闸设计[J].红水河,2006,25(2):62-68. 被引量:3
  • 3胡俊.水工墩墙裂缝的成因分析与防治措施[J].水利电力机械,2007,29(7):120-122. 被引量:1
  • 4SL191-2008,水工混凝土结构设计规范[S].
  • 5JTJ 252-1987干船坞设计规范(水工结构)[S].
  • 6John L Bignell, James M LaFave, Neil M Hawkins. Seismic Vulnerability Assessment of Wall Pier Supported Highway Bridges Using Nonlinear Pushover Analyses [ J ]. Engineering Structures ,2005,27 ( 14 ) :2044 - 2063.
  • 7M Osama Jannadi, Bassam M Tahir. A Concrete Pier: Case History of Failure and Repair[ J ]. Construction and Building Materials ,2000,14( 1 ) :7 - 16.
  • 8Jianfeng Chen ,Jie Han, Sadik Oztoprak, et al. Behavior of Single Rammed Aggregate Piers Considering Installation Effects [ J ]. Computers and Geotechnics ,2009 ,36 (7) : 1191 - 1199.
  • 9Mohamed A E I Gawady, Haitham M Dawood. Analysis of Segmental Piers Consisted of Concrete Filled FRP Tubes Original Research Article [ J]. Engineering Structures,2012, 38(1) :142 - 152.
  • 10L Binda, A Saisi, C Tiraboschi, et al. Application of Sonic and Radar Tests on the Piers and Walls of the Cathedral of Noto [ J ]. Construction and Building Materials, 2003 ( 17 ) : 613 - 627.

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部