拉西瓦水电站工程在建设过程中,通过不断的设计优化,实行设计监理制、招投标制、工程监理制,引入过程跟踪审计及工程量计量控制等中介机构参与投资控制,严格合同执行管理、材料核算等,对投资进行了有效的控制管理,降低了工程造价,取得了良好的经济效益。
Design optimization, design supervision system, bidding and tendering system and project supervision system are conducted continuously in the period of construction of Laxiwa Project. It also introduces the intermediary agencies for the process follow-up auditing and engineering metering control to involve in investment control. It strictly implements contract management and materials accounting and other methods. Therefore the effective control of investment is taken, the project cost is reduced and good economic benefits are achieved.