摘要
拉西瓦水电站泄水坝段进水口胸墙仓号结构较为复杂,为加快混凝土施工进度,保证混凝土外观质量,对胸墙与侧墙相交处角模板和进水口顶拱标准段胸墙模板,均采用轻型钢结构承重支撑系统模板,经过强度和稳定校核,模板设计满足要求,采用该模板施工后,满足了施工质量和进度要求。
The structure of Laxiwa sluice dam intake is more complicated. In order to speed up concrete pouring and ensure the concrete appearance, formworks used for the intersection of parapet and side wall and for the standard section crown parapet are consisted of light steel load-bearing support system. The strength and stability is designed to meet requirements, and construction quality and progress of intake meet the requirements after using these formwork.
出处
《水力发电》
北大核心
2009年第11期30-31,共2页
Water Power
关键词
进水口
胸墙模板
设计制作
施工方法
拉西瓦水电站
water intake
parapet formwork
design
construction method
Laxiwa Hydropower Station