摘要
2009年7月27日,英国举行了2012年奥运会三周年倒计时的纪念活动。尽管遭遇了严重的经济危机,伦敦奥运场馆建设仍然在顺利进行。本文介绍了伦敦奥运场馆最新的设计和建造情况。
On 27 July 2009, the UK celebrated 3 years to go until the opening ceremony of the 2012 Olympics. Despite under the serious economic recession, the development of London 2012 Olympics has been progressed smoothly. Most of the venues are being built on schedule to ensure that the Games will be held on time. This article introduces the latest development of London' s Olympic project with respect to their new design release and construction work. This article is the follow-up of the previous articles published in issue No.38 in 2007.
出处
《城市建筑》
2009年第11期31-35,共5页
Urbanism and Architecture