摘要
该文介绍了机动洛阳铲夯扩复合桩的施工过程及成桩机理,通过工程实践对比,指出夯扩复合桩比洛阳铲灌注桩具有更多的优越性。
The paper introduces the construction process and the pile formation mechanism of the mechanically drived Luoyang shovel tamping - enlarging composite pile. By practical comparison in vdrious projects, it should point out that the tamping - enlarging composite pile has more superiorities than the Luoyang shovel cast - in-place piles.
出处
《勘察科学技术》
1998年第5期19-21,24,共4页
Site Investigation Science and Technology
关键词
机动洛阳铲
夯扩复合桩
施工过程
成桩机理
桩基
mechanically drived Luoyang shovel
tamping-enlarging composite pile
construction process
pile formation mechanism
application effect