摘要
本文针对三峡特大型水轮发电机组总装过程施工难度大、质量要求高的特点,介绍了在机组总装中涉及的几个关键调整环节及其计算与调整技术。
The general assembly of Three Gorges super-huge turbogenerator is characterized by great difficulty of execution and high requirements of quality. Based on the above mentioned characteristics, this paper introduces several crucial adjusting procedures of turbogenerator's general assembly as well as their calculation methods and adjusting technique.