期刊文献+

能源中断和基础设施毁损时医疗卫生机构的准备和应对工作 被引量:4

Preparation and Response of Medical and Health Institutions when Energy Flow is Interrupted and Infrastructure is Damaged
下载PDF
导出
摘要 2008年中国南方部分省份的低温雨雪冰冻灾害和震惊世界的"5·12"四川汶川特大地震,都有一个共同特点,即灾区能源中断,基础设施毁损或失灵。本文总结了能源中断和基础设施毁损对医疗卫生机构的影响,分享了其准备和应对工作,经验与教训,对医疗卫生机构在能源中断和基础设施破坏时如何做好准备和应对工作给出了建议。 Energy interruption and infrastructure damage are the common characteristic between the snow disaster occurred in some southern provinces of China and the 5·12 Wenchuan earthquake in China in 2008. This paper summaries the effects on medical and health institutions caused by interruption of energy flow and damaged infrastructure, shares the preparation and response practices, experience, and lessons of medical disasters, and gives suggestions about how to prepare and response for medical and health institutions when energy flow is interrupted and infrastructure is damaged.
出处 《中国循证医学杂志》 CSCD 2009年第11期1147-1150,共4页 Chinese Journal of Evidence-based Medicine
关键词 汶川地震 雨雪冰冻灾害 医疗救援 能源中断 基础设施毁损 Wenchuan earthquake Snow disaster Medical rescue Energy interruption Infrastructure damage
  • 相关文献

参考文献1

  • 1陈顒,史培军.自然灾害.北京师范大学出版社.2007.

同被引文献42

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部