乌江彭水水电站导流洞第一标段洞身混凝土施工技术

Concrete construction technique for lining of diversion tunnel(No.1 tender section) of Pengshui Hydropower Station on Wujiang River
下载PDF
导出
摘要 在乌江彭水水电站导流洞第一标段洞身混凝土衬砌施工中采用了自制移动式钢筋台车,实现了大型断面的钢筋安装,并采用移动式全断面钢模台车、移动式半断面钢模台车、人工立模等工艺进行了混凝土衬砌中模板的施工以及大型马蹄形断面的导流洞混凝土衬砌,加快了施工进度、提高了施工效率,降低了施工成本,增强了施工的安全性,因而可在类似工程中推广。 During the construction of the concrete lining for the diversion tunnel ( No. 1 tender section) of Pengshni Hydropower Station on Wujiang River, the reinforcement assembling for large section is realized with a kind of self-made movable trolley for the assembling. Moreover, the technologies of movable full-section and half-section steel formwork carriers and manual formwork erection, etc. are also applied to the construction of formwork for the concrete lining and the concrete lining for the large Ushaped section of the tunnel with quickened construction progress, enhanced construction efficiency, lowered construction cost and higher construction safety, which can be widely popularized to the similar projects concerned.
出处 《水利水电技术》 CSCD 北大核心 2009年第11期94-98,共5页 Water Resources and Hydropower Engineering
关键词 导流洞 混凝土衬砌 施工方法 乌江彭水水电站 diversion tunnel concrete lining construction technique Pengshui Hydropower Station on Wujiang River
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部