摘要
为满足生产需求,对侯庄矿-425~-340m水平新矿石井进行改造。通过选择斜井反掘贯通测量的方法,并进行误差预计,得出贯通重要方向误差为0.09956m,满足了国标要求的精度规范;同时为了更好地保证贯通,应尽量进行多次独立测量。
In order to satisfy the yield demand,the ore well alteration was made to Houzhuang Mine between level -425--340 m. By the solution selection for the run-through measurement of the inclined shaft anti-de-sac and error prediction obtaining that the important direction run-through error was 0.099 56 m,so achieved the precision requirements range of the country,meantime in order to better ensure that run-through,a multi-independent measurement should be carried out necessarily.
出处
《山东冶金》
CAS
2009年第5期69-70,75,共3页
Shandong Metallurgy
关键词
斜井反掘
贯通测量
误差预计
贯通重要方向误差
the inclined shaft anti-de-sac
run-through measurement
error prediction
important direction run-through error