期刊文献+

水平定向钻穿越技术在渭河穿越中的应用 被引量:4

Application of Horizontal Directional Drilling Technology in Wei River Crossing
下载PDF
导出
摘要 通过分析地形、地质、穿越处地下管道等因素,确定了延炼—西安成品油管道工程应用水平定向钻技术穿越渭河的设计方案。论述了穿越管段壁厚及强度、回拖力计算方法及不充水回拖力计算,水平钻进的入土角、出土角选用,最小曲率半径的选取,穿越层位和穿越深度的确定。对施工中出现的回拖受阻问题提出有效措施。水平定向钻穿越技术在渭河穿越中的应用表明,水平定向钻穿越技术具有不破坏地貌、不影响交通、施工周期短等优点。 The design plan of applying horizontal directional drilling technology to Wei River crossing in laying the pipeline from Yan'an refinery to Xi'an was determined through analyzing the terrain,geology,and the underground pipeline section after crossing.The wall thickness and strength of the crossing pipeline,calculation method of back towing force and non-water-filled back towing force,selection of penetrating in-and-out angles,and the smallest curvature radius,and determination of crossing horizon and crossing depth were described.The effective measures on checked back towing were put forward.The application showed that horizontal directional drilling technology did not destroy the landscape and affect the traffic,and had shorter construction time.
出处 《石油规划设计》 2009年第6期42-44,共3页 Petroleum Planning & Engineering
  • 相关文献

参考文献2

  • 1GB50423-2007,油气输送管道穿越工程设计规范[S].
  • 2GB50424-2007,油气输送管道穿越工程施工规范[S].

共引文献50

同被引文献27

  • 1刘荣哲.水平定向钻穿越河流解卡技术的探讨[J].石油工程建设,2005,31(2):51-51. 被引量:10
  • 2李斌,李巨龙,周玲玲.水平定向钻进铺管水平孔段软土孔壁稳定性分析[J].岩土工程技术,2005,19(2):84-86. 被引量:10
  • 3李西军.管道定向钻孔法穿越天津海河[J].石油工程建设,1997,23(3):25-28. 被引量:3
  • 4Bennett R D, Ariaratnam S T. Horizontal directional drilling good practices guidelines[M]. 3rd Edition. Washington, D C: HDD Consortium, 2008.
  • 5FLAC. Fast lagrangian analysis of continua, User's manual, Itasca Consulting Group Inc. , USA [ M]. [ S. 1.]: [ s. n. ], 2004.
  • 6Lueke J S, Ariaratnam S T, Banerjee S,et al. Photogrammet ric methods for quality control of trenchless construction pro- jects[C]. NASTT Conference,2010,Paper D-1 -03.
  • 7Lueke J S,Ariaratnam S T. Experimental procedure for evalu- ating ground displacement factors in directional drilling [J]. Canadian Journal of Civil Engineering, 2003,30 (5) :830-840.
  • 8Dockter I. J. Development of an underground utility damage prevention plan(UUDPP) for company XYZ[R]. [S. 1. ]:The Graduate College University of Wisconsin Stout,2008 :6 -7.
  • 9Common Ground Alliance. Damage Information Reporting Tool[R]. Common Ground Alliance, Alexandria, VA. 2010:8-9.
  • 10Jiang R N, Ja'uregui D V, White K R. Close range photo- grammetry applications in bridge measurement: Literature re view[J]. Measurement,2008,41:823 -834.

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部