摘要
通过对自锚式悬索桥钢箱梁膺架吊装施工技术的运用实践,分析了膺架结构的工艺特点及相应吊装施工在安全质量控制上的技术要求,同时对该桥整体施工的组织安排进行了阐述。
Through construction technology practice of breast frame lifting, its process features and the corresponding lifting technology are analyzed.The technical requirements of safe control and the overall organization of the construction are described.
出处
《现代交通技术》
2009年第5期41-43,共3页
Modern Transportation Technology
关键词
自锚悬索桥
钢箱梁
膺架吊装
控制措施
施工技术
self-anchored suspension bridge
steel box girder
breast frame lifting
control measures
construction technology