摘要
碾压混凝土重力坝采用大仓面薄层连续浇筑 ,其层面是一个薄弱环节 ,这是与常规混凝土坝的主要区别之一。“八五”期间结合仿真模型试验和非线性有限元法计算 ,对碾压混凝土重力坝体层面破坏的形状、位置、发生条件及其影响因素进行了研究 。
Because the continuous pouring with large working surface and thin layer has been adopted in RCC gravity dam,its bedding surface is a weak link,which is one of main distinctions from the conventional concrete dam.During the Eighth-Five- Year Plan period,the studies on the shape,position,occurrence conditions and its influence factors of the bedding surface failure in RCC gravity dam body have been conducted in combination with the simulation model test and the calculations by non-linear finite element method,which provides the scientific basis for the design of RCC gravity dam.
出处
《水力发电》
EI
北大核心
1998年第11期31-33,共3页
Water Power
基金
"八 .五"国家重点科技攻关项目子题"龙滩碾压混凝土重力坝承载能力研究!(85 -2 0 8-0 4-0 4-30 )"部分成果
关键词
碾压混凝土
重力坝
破坏机理
稳定分析
龙滩水电站
RCC,gravity dam,failure mechanism,stability analysis,Longtan Hydropower Station