一起水电厂送出线路断线的原因与对策

The reason analysis about output transmission line breaking fault in a hydropower plant and countermeasures
下载PDF
导出
摘要 根据白沙水电厂110 kV送出线路断线故障现场的调查,对故障过程进行了介绍,分析了此次断线的主要原因及导线风偏放电30 s后存在同时遭受雷击的可能性,提出应根据输电线路所处的微地形与微气候情况,结合各灾害的成灾因子采取相应的防范措施。 According to the investigation of 110kV output transmission line breaking fault in Baisha Hydropower Plant,the fault process was introduced,the main reasons of line breaking were analyzed,and the probability of lightning strike of two wires simultaneously in 30s after discharge caused by windage yaw was discussed.It is pointed out that must adopt relevant prevention measures based on the micro-topography,the micro-climate of the transmission line location and various disaster-causing factors.
作者 罗和煦
出处 《华电技术》 CAS 2009年第11期53-55,共3页 HUADIAN TECHNOLOGY
关键词 输电线路 风偏闪络 断线 微地形 雷击 transmission line flashover caused by windage yaw line breaking micro-topography lightning strike
  • 相关文献

参考文献8

二级参考文献31

共引文献102

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部