摘要
文章主要对B&W662VT2BF-140型主机装置船上找正交验时,通过采用传统的工艺程序与改进后的工艺程序的比较,说明两种工艺程序的共同点与不同点,以及对修船周期的影响。
This article mainly explains to the B&W662VT2BF-140 main engine device on the ship to be a- ligned and checked. Comparison between the methods adopted in traditional workmanship procedure and the improved one shows the common points and different points of the two kinds of workmanship procedures, and influence for the ship period.
出处
《中国修船》
2009年第6期38-40,共3页
China Shiprepair
关键词
主机
工艺程序
校正
效率
main engine
workmanship procedure
alignment
efficiency