期刊文献+

王甫洲右导堤绕流场计算与模型试验研究 被引量:2

Numerical Compuation and Model Test on Flow Field around Right Training Dike of Wangfuzhou Project
下载PDF
导出
摘要 在势流假设条件下,采用水工模型试验与数值模拟两方法,互补交替逼近右导堤体型优化曲线。实践证明数值模拟的指导性与模型试验的验证作用加快了试验进程,提高了试验精度。 In this paper, under the potential flow assumption, the structural shape curve of the right training dike of Wangfuzhou Project is optimized by using the hydraulic model test and numerical simulation alternatively. It is proved in practice that the alternative utilization of the direct function of numerical simulation and model test verification may speed up the test proceeding and can raise test accuracy.
作者 费文才
出处 《长江科学院院报》 CSCD 北大核心 1998年第6期4-7,共4页 Journal of Changjiang River Scientific Research Institute
关键词 右导堤 流场 数值模拟 水工模型试验 right training dike flow field numerical simulation hydraulic model test
  • 相关文献

同被引文献4

  • 1左东启.水工设计手册[M].北京:水利电力出版社,1984..
  • 2.中华人民共和国行业标准.水工(常规)模型实验规程[S].北京:中国水利水电出版社,1995..
  • 3阎晋垣 张宗孝 张志昌.消力池上游增设消能工消能量的计算[J].陕西机械学院院报,1989,(4).
  • 4张宗孝,马斌,魏文礼.齿墩与消力池联合消能机理分析[J].应用力学学报,2002,19(3):46-49. 被引量:1

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部