摘要 采用统一时间离散化方法,用改进的差分进化算法求解带有限中间存储的连续生产过程和间歇生产过程混合的化工生产调度问题.提出随机产生符合容量约束的任务队列组成染色体的新的编码方式,采用块交叉和块变异进化操作.为了提高算法全局收敛能力,该文对算法的选择操作进行了改进,并通过Logisic混沌映射方法获得交叉算子CR的取值.最后,通过化工算例仿真来说明模型和算法的有效性. In order to solve the scheduling problems of mixed batch and continuous processes,continuous time was discretized,and an improved differential evolution algorithm was developed.A new chromosome representation was proposed,taking into account capacity constraints.And a new crossover method and a new mutation method were brought forward based on the new chromosome representation.The value of the crossover operator CR was obtained by using the logisic chaotic map method,and the selection operator was improved to promote the global search ability.The results of the simulation indicate that the model and the method are feasible.
出处 《系统工程理论与实践》 EI CSCD 北大核心 2009年第11期157-167,共11页 Systems Engineering-Theory & Practice
基金 国家863计划(2007AA04Z155) 国家自然科学基金(60874074) 浙江省自然科学基金(Y1090592)
关键词 连续生产过程 间歇生产过程 差分进化算法 混沌映射 continuous process batch process differential evolution chaotic map
  • 相关文献

参考文献14

  • 1Giannelos N F, Georgiadis M C. A novel event-driven formulation for short-term scheduling of multipurpose continuous processes[J]. Industrial and Engineering Chemistry Research, 2002(41): 2431-2439.
  • 2双兵,顾幸生.面向定单交货期窗的连续生产过程生产调度[J].中南工业大学学报,2003,34(4):420-423. 被引量:6
  • 3Mendez C A, Cerda J. An efficient MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities[J]. Computers and Chemical Engineering, 2002(26): 687-695.
  • 4苏生,战德臣,徐晓飞.一种并行机多产品厂短期调度连续时间模型[J].计算机集成制造系统,2006,12(4):494-498. 被引量:7
  • 5Mockus L, Reklaitis G V. Continuous time representation approach to batch and continuous process scheduling: 1. MINLP formulation[J]. Industrial and Engineering Chemistry Research, 1999(38): 197-203.
  • 6Behzad B, Mahmoud R P, Davood R. Optimal scheduling of mixed batch and continuous processes incorporating utility aspects[J]. Chemical Engineering and Processing, 2007(46): 271-281.
  • 7王万良,陈志强,张治辉,吴启迪.面向定单的连续生产过程动态调度方法[J].系统工程,2002,20(4):44-48. 被引量:3
  • 8徐智,席裕庚,韩兵.基于遗传算法的一类带缓冲区的混合生产调度[J].控制理论与应用,2001,18(5):675-680. 被引量:7
  • 9Storn R, Price K. Differential evolution -- A simple and efficient heuristic for global optimization over continuous spaces[J]. Journal of Global Optimization, 1997, 11(4): 341-359.
  • 10Godfrey O, Donald D. Scheduling flow shops using differential evolution algorithm[J]. European Journal of Operational Research, 2006(171): 674-692.

二级参考文献47

  • 1陈华平,谷峰,卢冰原,古春生.自适应多目标遗传算法在柔性工作车间调度中的应用[J].系统仿真学报,2006,18(8):2271-2274. 被引量:25
  • 2李平.[D].上海:华东理工大学自动化研究所,2002.
  • 3Backer K R. Sequencing with earliness and tardiness penalties:A Review [J]. Oper Res, 1990, 38:22-36.
  • 4Li C L, Cheng T C E. Due-date determination with resequencing[J]. IIE Transaction, 1999,31 : 183-188.
  • 5Ishii H, Tada M, Masuda T. Two machine scheduling problems with fuzzy due-dates[J]. Fuzzy Sets and Systems, 1992,46(3) :339-347.
  • 6Sung C S, Min J I. Scheduling in a two-machine flowshop with batch processing machine (s) for earliness/tardiness measure under a common due date[J]. Euro J of Oper Res, 2001,131:95-106.
  • 7Fang Jian,上海交通大学学报,1997年,31卷,3期,49页
  • 8Chang Shichung,IEEE Trans Robot Automat,1994年,10卷,4期,112页
  • 9KONDILI E,PANTELIDES C C,SARGENT R W H,et al.A general algorithm for short-term scheduling of batch operations-Ⅰ.MILP formulation[J].Computers and Chemical Engineering,1993,17(2):211-227.
  • 10SHAH N,PANTELIDES C C,SARGENT R W H.A general algorithm for short-term scheduling of batch operations-Ⅱ.Computational issues[J].Computers and Chemical Engineering,1993,17(2):229-244.

共引文献34

同被引文献42

  • 1梁静,钱省三,马良.基于双层蚂蚁算法的半导体炉管制程批调度研究[J].系统工程理论与实践,2005,25(12):96-101. 被引量:7
  • 2鞠全勇,朱剑英.多目标批量生产柔性作业车间优化调度[J].机械工程学报,2007,43(8):148-154. 被引量:64
  • 3IERAPETRITOU M G, FLOUDAS C A. Effective continu- ous-time formulation for short-term scheduling. 2. continuous and semicontinuous processes[J]. Industrial & Engineering Chemistry Research, 1998, 37(11).. 4341-4359.
  • 4MENDES J J M, GONCALVES J F, RESENDE M G C. A random key based genetic algorithm for the resource constrain- ed project scheduling problem[J]. Computers & Operations Research, 2009, 36(1): 92-109.
  • 5CASTRO P M, BARBOSA-POVOA A P, MATOS H A, et al. Simple continuous-time formulation for short-term schedu- ling of batch and continuous processes[J]. Industrial and En- gineering Chemistry Research, 2004, 43(1): 105-118.
  • 6SHAW K J, LEEP L, NOTT H P, et al. Genetic algorithms for multiobjective scheduling of combined batch/continuous process plants [C]//Proceedings of the 2000 Congress on Evolutionary Computation. Washington, D. C. , USA: IEEE, 2000 : 293-300.
  • 7LIXIN T, XIANPENG W. A scatter search algorithm for a multistage production scheduling problem with blocking and semi-continuous batching machine[J]. IEEE Transactions on Control Systems Technology, 2011, 19(5): 976-989.
  • 8KARABOGA D. An idea based on honey bee swarm for nu- merical optimization [ R ]. Kayseri, Turkey: Erciyes University, 2005.
  • 9AKAY B, KARABDGA D. A modified artificial bee colony algorithm for real-parameter optimization [J]. Information Sciences, 2010,DOI: 10. 1016/j. ins. 2010. 07. 015.
  • 10AYAN K, KILIC U. Artificial bee colony algorithm solution for optimal reactive power flow[J]. Applied Soft Computing, 2012, 12(5): 1477-1482.