摘要
广州亚运城项目建设世界瞩目,在地域广,建筑量庞大,时间短,要求高,新技术多,参建单位众多的情况下,如何搞好建设项目质量控制引起各方关注,文中介绍技术官员村施工质量控制方法及措施,从侧面反映该项目工程质量一直处于可控状态。
The Project of the Asian Games Village in Guangzhou is Focus of world attention. It s very interested in condition of broad region,enormous construcion volume,short construction period,high claim,many new technique and many enterprise involvement in construction. The paper introduce methods and measure of quality control of technology officials village civil engineering. It gives expression to construction quality in controllability condition from phase.
出处
《广东土木与建筑》
2009年第9期60-61,共2页
Guangdong Architecture Civil Engineering
关键词
质量控制
定板
引路
通报
处罚
quality control
determine model
lead the way
convey
punish