南水北调西线超长隧洞施工环境卫生标准研究 被引量:2

Study on Health Standards of Working Environment in Extra-long Tunnels on West Route of South-to-North Water Transfer Project
下载PDF
导出
摘要 南水北调西线工程地处青藏高原,输水线路长达320 km,超长隧洞修建时的施工通风问题尤为突出,现阶段没有高原隧洞施工环境的卫生标准。高原低压、缺氧环境下采用平原地区的隧洞环境卫生标准,势必对施工作业人员的健康产生极大影响,针对高原气候特点,结合国内外隧洞卫生标准,提出了高原条件下隧洞施工环境主要卫生标准,为南水北调西线工程施工提供借鉴。 West Route of South-to-North Water Transfer Project, located on Qinghai-Tibet Plateau, has a 320km-long water transfer route. The construction ventilation of the extra-long tunnels of the project is a great concern. So far there is no health standards available in China dedicated for the construction environment in tunnels on high plateaus. If the health standards for tunnels on plain were adopted for tunnels on high plateaus, where the atmospheric pressure is low and the oxygen is insufficient, the health of the workers would be jeopardized. Health standards for the construction en- vironment in tunnels on high plateaus are proposed on basis of the climatic characteristics of high plateaus and the exist- ing health standards for tunnels specified in Chinese and foreign specifications. The proposed health standards can pro- vide reference for the construction of tunnels on West Route of South-to-North Water Transfer Project.
作者 罗占夫
出处 《隧道建设》 2009年第5期496-498,547,共4页 Tunnel Construction
基金 国家科技支撑计划资助项目(2006BAB04A06)
关键词 南水北调 西线 高原隧道 超长 施工通风 卫生标准 south-to-north water transfer project west route tunnel on plateau extra-long tunnel construction ventilation health standard
  • 相关文献

参考文献7

二级参考文献19

共引文献43

同被引文献14

引证文献2

二级引证文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部