Reserve estimation of an open pit mine under price uncertainty by real option approach 被引量:8

Reserve estimation of an open pit mine under price uncertainty by real option approach
下载PDF
导出
摘要 Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a high degree of uncertainty to the reserve estimation, and in consequence to the whole mine planning procedure. Real option approach is an efficient method of decision making in the uncertain conditions. This approach has been used for evaluation of defined natural resources projects until now. This study considering the metal price uncertainty used real option approach to prepare a methodology for reserve estimation in open pit mines. This study was done on a copper cylindrical deposit, but the achieved methodology can be adjusted for all kinds of deposits. This methodology was comprehensively described through the examples in such a manner that can be used by the mine planners. Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a high degree of uncertainty to the reserve estimation, and in consequence to the whole mine planning procedure. Real option approach is an efficient method of decision making in the uncertain conditions. This approach has been used for evaluation of defined natural resources projects until now. This study considering the metal price uncertainty used real option approach to prepare a methodology for reserve estimation in open pit mines. This study was done on a copper cylindrical deposit, but the achieved methodology can be adjusted for all kinds of deposits. This methodology was comprehensively described through the examples in such a manner that can be used by the mine planners.
出处 《Mining Science and Technology》 EI CAS 2009年第6期709-717,共9页 矿业科学技术(英文版)
关键词 RESERVE open pit mining metal price uncertainty Real Option Approach (ROA) copper deposit 实物期权方法 价格波动 不确定性 露天矿 估计 储备 储量计算 资源评价
  • 相关文献

参考文献11

  • 1Mark Gershon.Heuristic approaches for mine planning and production scheduling[J].International Journal of Mining and Geological Engineering.1987(1)
  • 2SME (Society of Mining,Metallurgy and Exploration).A guide reporting exploration information, resources and reserves[].Mining Engineering.1991
  • 3Lillico T M.Economics and open pit design-beware of break-even ratios[].International Journal of Rock Me- chanics and Mining Science & Geomechanics Abstracts.1974
  • 4Koskiniemi B C.Hand methods in open pit mine plan- ning and design[].SME/AIME Transactions.1979
  • 5Zhao Y,Kim Y C.A new ultimate pit limit design algo- rithm[].rd APCOM.1992
  • 6Yamatomi J,Mogi G,Akaike A,Yamaguchi U.Selective extraction dynamic cone algorithm for three dimensional open pit designs[].th APCOM.1995
  • 7David M,Dowd P A,Korobov S.Forcasting departure from planning in open pit design and grade control[].th APCOM.1974
  • 8Dowd P A,Onur A H.Optimizing open pit design and scheduling[].rd APCOM.1992
  • 9Dowd P A,Onur A H.Open pit optimization–part 1: optimal open pit design[].IMM Transactions.1993
  • 10Gershon M E.A linear programming approach to mine scheduling optimization[].th APCOM.1982

同被引文献39

引证文献8

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部