摘要
本文以厦门市厦禾路文灶交叉口平面渠化为实例叙述了交叉口平面渠化的一般步骤和方法,并对渠化前后交叉口通行能力和车辆平均延误水平进行了分析。
General steps and methods are described here for channellizing the middlelayer intersection, and analysis is given of the intersection traffic capacity and the average delayof vehicles before and after channelization. The practice of plane channellization at Xiahe Rd/Wenzao Intersection, Xianmen, is exampled.
出处
《中国市政工程》
1998年第4期1-5,共5页
China Municipal Engineering
关键词
交叉口
渠化
通行能力
延误
intersection
channellization
intersection service level
trafficcapacity
delay