京阳水泥公司熟料筒仓采用预应力结构体系,在穿索、张拉、灌浆施工中均采取了具体措施,在预应力钢绞线张拉伸长值的计算中采用了更精确的方法,使结果更加符合实际。
The design of the Jingyang Cement Mill's clinker silo has been adopted with a prestressed concrete structure system.All construction has been adopted with practical measures such as constructions of cable' s penetrating,stretching and grouting etc.During the stretching procedure of steel cable,their length extension rate has been calculated with a more accurate method and thereby their results have been more consistent with practical situation and condition.
出处
《建筑技术》
北大核心
1998年第12期840-841,共2页
Architecture Technology
关键词
预应力
筒仓
钢绞线
张拉
混凝土
prestressing force,silo,steel cable,stretching