期刊文献+

基于时空解析技术的跨流域水电站群优化调度系统研究与开发 被引量:2

Research and Development of System about Hydropower Station Group's Optimized Dispatching in Different Drainage Based on Technique at Parsing of Time and Space
下载PDF
导出
摘要 针对云南电网复杂的水电站群系统现状,本文提出了基于时空解析技术的跨流域水电站群优化调度系统,系统通过深度优先搜索技术解析梯级水电站群空间位置,采用面向对象技术,自动建立与相邻水电站间空间与时间关系,提高应用系统效率和水调管理水平。 In allusion to complicated system's actuality of hydropower station group of Yunnan Power Grid, the system about hydropower station group's optimized dispatching in different drainage based on technique at parsing of time and space is proposed in this paper. In this system, the tridimensional locality of hydropower station group are parsed through application of the in-depth and preferential searching technic, and with the object-oriented technologies the relation at time and space between adjacent hydropower station are established automatically. So that the efficiency of system's application and level of hydropower scheduling & management are improved.
出处 《南方电网技术》 2009年第B11期174-177,共4页 Southern Power System Technology
关键词 水电站群优化调度 时空解析技术 跨流域水电站群优化调度系统 hydropower station group's optimized dispatching technique at parsing of time and space system about hydropower station group's optimized dispatching in different drainage
  • 相关文献

参考文献5

  • 1袁晓辉,王乘,张勇传,袁艳斌.水电系统短期经济运行的新方法[J].水力发电学报,2006,25(4):1-5. 被引量:12
  • 2张勇传,邴凤山,刘鑫卿,付昭阳,揭明兰.水库群优化调度理论的研究—SEPOA方法[J]水电能源科学,1987(03).
  • 3纪昌明,冯尚友.混联式水电站群动能指标和长期调度最优化(运用离散微分动态规划法)[J]武汉水利电力学院学报,1984(03).
  • 4D. Nagesh Kumar,M. Janga Reddy. Ant Colony Optimization for Multi-Purpose Reservoir Operation[J] 2006,Water Resources Management(6):879~898
  • 5Ramesh S. V. Teegavarapu,Slobodan P. Simonovic. Optimal Operation of Reservoir Systems using Simulated Annealing[J] 2002,Water Resources Management(5):401~428

二级参考文献7

  • 1Z.K.Shawwash,T.K.Siu,S.O.Russell.The B.C.Hydro short term hydro scheduling optimization model[J].IEEE Trans on Power Systems,2000,15(3):1125 ~ 1131.
  • 2Ernan Ni,Xiaohong Guan.Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs[J].IEEE Trans.on Power Systems,1999,14(3):1127 ~ 1132.
  • 3R Naresh,J.Sharma.Hydro system scheduling using ANN Approach[J].IEEE Trans on Power Systems,2000,15 (1):388 ~ 394.
  • 4P.H.Chen,H.C.Chang.Genetic aided scheduling of hydraulically coupled plants in hydro-thermal coordination[J].IEEE Trans.on Power Systems,1996,11 (2):975 ~ 981.
  • 5K.Deb,R.B.Agrawal.Simulated binary crossover for continuous search space[J].Complex Systems,1995,9(6):115 ~ 148.
  • 6C.Choi.Dynamic bidirectional associative memory using chaotic neural network[D].Korea Advanced Institute of Science & Technology,1998.
  • 7S.O.Orero,M.R.Irving.A genetic algorithm modelling framework and solution technique for short term optimal hydrothermal scheduling[J].IEEE Trans.on Power Systems,1998,13 (2):501 ~ 518.

共引文献11

同被引文献12

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部