摘要 三峡地下厂房天锚作为桥式起重机吊装的重要设施,在投入生产之前采用电测法对其安全性进行了荷载试验检查,并对荷载试验过程中的天锚锚杆受力及其变化情况采用电测法进行了应变监测。监测成果显示,电阻应变计实测规律性明显,且测值均未超过设计允许范围,表明天锚是安全的。 The electrical measuring method is one of the methods to use for structural element' s stress analysis in engineering. It' s applied widely for its sizes is small, and measurement operation flexible, and accuracy high. The up-anchors of underground power house of TGP are important facilities used as the handing of a tower crane, so it must be examined in safety by loading experiment before using in production. All together, the stress and its change of up-anchors are monitored during the loading experiment. The achievements show that regularities are significant by real measurement using resistance strain gauges. The measured values are all in the allowable range. It shows that the up-anchors are safety.
出处 《长江科学院院报》 CSCD 北大核心 2009年第12期29-32,共4页 Journal of Changjiang River Scientific Research Institute
关键词 电测法 地下厂房 天锚 荷载 应变 监测 electrical measuring method underground powerhouse up-anchor load strain monitor
  • 相关文献

参考文献5

二级参考文献2

  • 1陈仁民 戴娟.王程力学[M].北京:机械工业出版社,1997.171-175.
  • 2张秉荣 章剑青.工程力学[M].北京:机械工业出版社,2001.274-277.

共引文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部