摘要
文章着重对工程量清单招投标的具体操作要点、工程量清单在建设工程项目投标过程中可能出现的问题、投标企业对工程量清单招标的应对方法等进行了阐述。
The article focuses on the main points, possible difficulties and the countermeasures against them for the bidder in carrying out the bidding mode of Evaluation with Bill of Quantities for the construction project.
出处
《安徽建筑》
2009年第6期128-129,共2页
Anhui Architecture
关键词
建设工程
工程量清单
招投标
要点分析
construction engineering
bill of quantities
bid
analysis of the main points