CCTV主楼施工过程结构关键点位的变形监测技术 被引量:5

Deformation Monitoring Technique for CCTV Main Tower during Construction
原文传递
导出
摘要 CCTV主楼双向倾斜的两塔楼在高空通过巨型悬挑结构连成一体,建筑造型独特,在重力荷载作用下,其结构变形特征与常规塔楼存在显著差别。为监控施工过程的安全性、及时反馈指导施工,对施工全过程结构关键点位的三维空间变形进行监测。为验证实测结果的合理可靠性,进行了施工过程模拟计算分析,并计入了地基不均匀沉降和季节温度变化的影响因素。 The profile of CCTV main tower is unique, with a huge cantilever at the top linking two bidirectional leaning sub-towers as integrity. Under gravity load, the deformation feature has much discrepancy with a normal tall building. To secure the construction safety and feed back to guiding construction, the three dimensional displacement monitoring of the key points was conducted during construction. The construction process analogy FEA was done to verify the rationality of the monitoring results. To improve calculation accuracy, the differential settlement of foundation and the seasonal temperature variation are taken into account in calculation.
出处 《建筑科学》 北大核心 2009年第11期91-94,90,共5页 Building Science
基金 国家科技支撑计划资助(2006BAJ01B04)
关键词 巨型悬臂 变形监测 施工过程模拟分析 huge cantilever deformation monitoring construction process analogy FEA
  • 相关文献

参考文献1

  • 1中国建筑科学研究院.《CCTV主楼施工变形与应力监测总结报告--变形监测》[R].2008.

同被引文献41

  • 1蔡巍,王恩宏.广州国际会议展览中心钢结构施工监测[J].广州建筑,2003,31(1):25-27. 被引量:2
  • 2杨诚.某超高层考虑混凝土徐变收缩的施工模拟分析[J].广东土木与建筑,2013,20(6):14-16. 被引量:3
  • 3王刚,姚谦峰.环境激励下框架结构体系的模态识别方法研究[J].工业建筑,2004,34(12):45-47. 被引量:7
  • 4Chowdhary P, Sharma R K. Evaluation of creep and shrinkage effects in composite tall buildings [ J ]. The Structural Design of Tail and Special Buildings, 2011, 20 ( 7 ) : 871 -880.
  • 5Ellobody E, Young B. Numerical simulation of concrete encased steel composite columns [ J ] . Journal of Constructional Steel Research, 2011, 67(2) :211-222.
  • 6Brownjohn J M W. Structural health monitoring of civil infrastructure[ J]. Philosophical Transactions of the Royal Society A, 2007,365 ( 1851 ) :589-622.
  • 7Dundar C, Tokgoz S, Tanfikulu A K, et al. Behavior of reinforced and concrete-encased composite columns subjected to biaxial bending and axial load [ J ]. Building and Environment, 2008, 43(3) :1109-1120.
  • 8Fintel M, Ghosh S K, Iyengar H S. Column shortening in tall buildings-prediction and compensation [ M ]. Engineering Bulletin No. EBIO8D. PCA: Washington DC, 1987.
  • 9ACI Committee 209. ACI 209R-92 Prediction of creep, shrinkage and temperature effects in concrete structures [ R ]. American Concrete Institute: Farmington Hills MI, 1997.
  • 10Comite Euro-intemational Du Beton. CEB-FIP model code [ S]. London: Thomas Telford Publishing, 1993.

引证文献5

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部